What is Virtual Commissioning and why do you need it?

Virtual Commissioning is the creation of a virtual environment for testing control programs for automated facilities before the facility is built or renovated.

Virtual Commissioning PLC Testing

We are all presented with new technologies or the repurposing of a technology on a daily basis. As engineers, manufacturers, or decision makers, we must decide if this technology will enhance what we do and if it is worth the investment using a process called Virtual Commissioning.

This is the first in a series of articles that look closer at the individual pieces of a digital twin world from a perspective of history, how its fits in the big picture, the details of the technology, the challenges it presents, and a practical example of the technology as a reference.

What is Virtual Commissioning?

Virtual Commissioning, also known as PLC Emulation, is the creation of a virtual environment that allows the user to test controls programs for automated facilities before the facility is built or renovated. Traditional applications of the technology include creating a virtual manufacturing simulation to connect to a real or virtual PLC so the ladder logic of the PLC can be fine tuned and validated before the launch of a program.

The diagram below shows a typical set up for PLC emulation (virtual commissioning). The hardware for the factory is represented by the simulation environment, the PLC (either real or virtual) runs the PLC code to be verified, and a server program acts as the conduit between the two environments across a common network of some sort. In this case, the simulation is the OPC client, the OPC server acts as the conduit, and the PLC runs the code that is being verified. Ethernet is the network providing the connection between the various programs. There are many variations to this theme. Sometimes the server and client operate as one program. Sometimes there are multiple PLCs or they are run “virtually” as well to allow the entire setup to be run without having physical hardware or a physical PLC. Lastly, OPC is not the only communication protocol. Each PLC has a more native language that can be used to communicate faster. OPC is simply a generic way to discuss these connections.

Virtual commissioning

Virtual commissioning

History

My first experience with Virtual Commissioning was in 1993 working with Deneb Robotics.

We were able to hook up a series of hardware switches to a 3D computer simulation of a series of conveyors and control the route that a part took through the simulation by toggling switches. This setup required a few expensive UNIX workstations, a small PLC program, and a simple simulation. It was a cool demonstration of technology but not terribly useful for reducing the amount of time it took to launch a complex controls project. In those days we were exchanging entire “words” of information and then parsing out the bits we needed from memory to make decisions. We used OPC to provide the connection between the various technologies to make this happen

As time progressed, specialized simulation programs emerged that were designed to make these connections and simulations easier to build. Today there are several companies that tout solutions in this space that are standalone ways to model systems quickly. As with many of the technologies will discuss, the tradeoff comes down to the specialized interface of a standalone product that is specifically targeted at a problem versus the collaborative synergy of a larger suite of tools that save time by connecting users and data in a consistent manner.

Why do Virtual Commissioning?

So how does virtual commissioning fit into the Digital Twin story? As we create new ways to manufacture and distribute goods, we need to be faster in renovating our facilities. The automotive market has been at the leading edge of this concept for a few decades. They are often presented with a short shutdown in the summer and winter of about two weeks each where they can make model year and major renovations to support the next model year of their vehicles. They do not want to wait for conveyor or other equipment to be set up on their floor to test any custom PLC ladder logic required to run the system. They also do not want to pay for the expense of their vendors “running off” the equipment in a standalone fashion (different than their environment).

This lengthens the project timeline and only finds the most basic issues in the ladder logic. Instead, they opt for a virtual version of the next generation of the manufacturing operations. The controls engineers are required to bring their programs to a lab and test them well ahead of the planned shutdown. This allows for more aggressive scheduling during the shutdown and more possible changes in the same time period. The cost savings from this approach can be substantial but the true benefit is accelerating an implementation and reducing the time to market.

The Reality

What are the challenges with Virtual Commissioning? As with any endeavor to change, you are often met with resistance from the status quo. Controls engineers do not want someone overseeing their methods and dictating their timing for a project. It is also true that Virtual Commissioning is excellent at enforcing programming standards that are often unappreciated by those who are responsible for writing the code.

Another issue is the availability of data. In a standalone mode, the simulation modeler can have a difficult time staying current with the mechanical team’s drawings of the physical layout and the controls view of memory allocation, I/O design, and ladder logic development. This is where a collaborative environments shine. They house all the relevant data in a common database and the modeler can be sure that the data is current. A single source of truth, so to speak.

The next challenge is timing. When to build and analyze. System wide simulations are often done in the very early stages of a project to determine the amount of equipment and best configurations for a given space in a manufacturing facility. This simulation would generally be excellent for the future testing of PLC code but often the controller, IO, or even the control philosophy is not known at these early stages. All too often, these initial factory models are not used in emulation because the logic that will eventually reside in the PLC is coded into the factory model in a different proprietary language. This can also be addressed by a common database for all types of analysis and modeling. The effort spent in the early stages can be reused when it comes time to develop a virtual version for commissioning.

The last word of warning is speed related. There have been many advances in technology over the years that allow for direct, native communication with PLCs but high speed and high IO traffic can cause delays in the turnaround times for the information flow to and from the simulation and the PLC. Testing of a system is warranted whenever the system is large, or the response time is critical.

DELMIA Virtual Commissioning Analyst

DELMIA Virtual Commissioning Analyst

The Practical View

To tie together the conversation, an example of a past project is a good way to wrap up these discussions. We discussed the traditional automotive example for commissioning a new system on a tight timeline. There is also the case where changes are being made continuously to a system that runs almost 24×7. Approximately 15 years ago, Forward Vision worked with a large computer manufacturer on a system where they received orders for computers over the internet and phone. These orders fed all the way through their systems to the assembly workstations on the floor. Their challenge was the ground floor of this digital stack. They wanted to test all of the ordering and accounting systems that all tied together down to the actual creation of the computer on the floor but the facility ran 164 out of 168 hours each week. They only had a four-hour window for loading new programs and testing them.

Very little time existed for debugging. We built them a virtual environment (simulation) and set up a lab of 8 Physical PLCs. They were able to use that test bed to improve their system and add new features without impacting production or the experience of their users. It is a great example of using virtual commissioning as a continuous improvement tool and it is a creative solution to a problem that was slowing innovation and hurting the quality of the end product.

Virtual Commissioning Analyst on the 3DEXPERIENCE Platform

Using DELMIA software from TriMech your business can execute virtual commissioning scenarios on a Manufacturing virtual twin including accurate simulation of equipment and sensors connected to a PLC program. The 3DEXPERIENCE Virtual Commissioning Analyst role enables companies to:

  • Create sensors, generate and transform parts for multicycle scenarios in conjunction with DELMIA Equipment & Layout Engineer
  • Enable virtual validation and correction of the PLC Program to accelerate the start of production
  • Save costly downtime by leveraging the virtual twin to train operators and maintenance workers
  • Forecast the workcell cycle time to ensure the production rate by simulating all mechanical and software behaviors
DELMIA Virtual Commissioning Role

DELMIA Virtual Commissioning

Summary

Virtual commissioning has been around a long time. Getting quality data in a timely fashion is a key to accurate modeling and the data often changes quickly. This supports the case for incorporating it into a large Digital Twin effort but be aware that people will want to stay with their current methods and the speed of the final solution should be tested before a large project is conducted.

Related Software

DELMIA

DELMIA is a Global Industrial Operations software that specializes in digital manufacturing and manufacturing simulation.

Related Content

The Importance of Antennas in Autonomous Vehicle Communication

The Importance of Antennas in Autonomous Vehicle Communication

As the era of autonomous vehicles (AVs) continues to evolve, the importance of efficient and effective communication between vehicles and their surrounding infrastructure has never been more crucial. One key component that underpins this communication is the antenna. In this blog post, we will explore antennas’ critical role in enabling vehicle-to-vehicle (V2V) and vehicle-to-infrastructure (V2I)…

Read More...
Track Defects & Provide Step-by-Step Manufacturing Instructions to ensure Quality Control with DELMIA Apriso

Track Defects & Provide Step-by-Step Manufacturing Instructions to ensure Quality Control with DELMIA Apriso

In today’s fast-paced manufacturing environment, it is essential to have a quality control system that can keep up with the demands of industry. Manual quality control processes can be time-consuming and prone to errors, leading to costly defects and delays in production. That’s where DELMIA Apriso Quality Control comes in, putting you back in control…

Read More...
The Role of Big Data and Analytics in Defense

Big Data and Analytics: Revolutionizing Defense Mission Readiness and Asset Lifespan

Big data and analytics have the potential to transform the defense sector, particularly when it comes to improving mission readiness and extending the lifespan of aging assets. Using data-driven platforms like Dassault Systèmes’ 3DEXPERIENCE to create virtual twins, defense organizations can use predictive analytics to optimize maintenance schedules and processes for various defense systems.  France’s…

Read More...